Vehicular Access Using Geotrack With CORE Geocell and Galvanised Anchors - The Ideal Garden

[vc_row css=”.vc_custom_1454777636065{margin-top: -40px !important;}”][vc_column width=”2/3″][vc_gallery type=”flexslider_slide” interval=”5″ images=”11918,11919,11916″ img_size=”750×420″ onclick=””][/vc_column][vc_column width=”1/3″][vc_separator css=”.vc_custom_1454777389691{margin-bottom: 20px !important;}”][vc_column_text css=”.vc_custom_1454776891000{margin-bottom: 10px !important;}”]

PROJECT LOCATION:

[/vc_column_text][vc_column_text]

GERRARDS CROSS, BUCKINGHAMSHIRE

[/vc_column_text][vc_separator css=”.vc_custom_1454777529683{margin-top: -20px !important;margin-bottom: 20px !important;}”][vc_column_text css=”.vc_custom_1454777004573{margin-bottom: 10px !important;}”]

CONTRACTOR:

[/vc_column_text][vc_column_text]

AK CONSTRUCTION LONDON LTD

[/vc_column_text][vc_separator css=”.vc_custom_1454777529683{margin-top: -20px !important;margin-bottom: 20px !important;}”][vc_column_text css=”.vc_custom_1454777083357{margin-bottom: 10px !important;}”]

CLIENT:

[/vc_column_text][vc_column_text]

MR AND MRS CUMBERBATCH

[/vc_column_text][vc_separator css=”.vc_custom_1454777529683{margin-top: -20px !important;margin-bottom: 20px !important;}”][vc_column_text css=”.vc_custom_1454777154202{margin-bottom: 10px !important;}”]

PRODUCTS USED:

[/vc_column_text][vc_column_text]

CORE GEOCELL, CORE GALVANISED METAL ANCHORS

[/vc_column_text][vc_separator css=”.vc_custom_1454777529683{margin-top: -20px !important;margin-bottom: 20px !important;}”][/vc_column][/vc_row][vc_row][vc_column css=”.vc_custom_1454774485502{margin-bottom: -20px !important;}”][vc_column_text]

[/vc_column_text][vc_separator][vc_column_text css=”.vc_custom_1454775547678{margin-bottom: 10px !important;}”]

PROJECT BRIEF:

[/vc_column_text][vc_column_text]

COST EFFECTIVE VEHICLE ACCESS TO STABLE BLOCKĀ 

[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]The client required a cost-effective vehicle access to her stable block across from a field that was prone to standing water during the winter months. The council had stipulated that the finished track must be non-obtrusive with no visual impact in this green belt area.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column css=”.vc_custom_1454774350644{margin-top: -20px !important;margin-bottom: -20px !important;}”][vc_separator][/vc_column][/vc_row][vc_row][vc_column css=”.vc_custom_1454774485502{margin-bottom: -20px !important;}”][vc_column_text css=”.vc_custom_1454775624078{margin-bottom: 10px !important;}”]

PRACTICAL SOLUTION:

[/vc_column_text][vc_column_text]

RECYCLE MATERIAL COMBINED WITH CORE GEOCELL AND GALVANISED ANCHORSĀ 

[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]The surface vegetation was removed, and the footprint of a large track was created. Sub soil was scraped from the footprint, being set aside for its reuse. The level was set to allow the surface of the track to sit slightly proud of the surrounding field. CORE geocell was expanded over the area and held open in place using CORE galvanised metal anchors. Recycled stone and subsoil were deposited into the cellular structure and re compacted, with the edges of the track being filled and graded with the remaining subsoil to blend into the field. The entire works area was seeded with a wild meadow seed mix.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column css=”.vc_custom_1454774350644{margin-top: -20px !important;margin-bottom: -20px !important;}”][vc_separator][/vc_column][/vc_row][vc_row][vc_column css=”.vc_custom_1454774485502{margin-bottom: -20px !important;}”][vc_column_text css=”.vc_custom_1454775798141{margin-bottom: 10px !important;}”]

ADVANTAGES:

[/vc_column_text][vc_column_text]

“THE GEOCELL ALLOWING THE REUSE OF EXISTING MATERIAL MADE IT FAR EASIER FINANCIALLY WITH A GREAT END RESULT”

[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]By using CORE geocell, the existing surface could be utilised as part of the sub base producing a significant saving on cost whilst improving the environmental impact at the same time. The new height of the access track allowed it to sit slightly above the water level that arose in winter months, keeping the access both firm and dry. The cellular structure is hidden below the surface, leaving no visual impact once the vegetation has re-established itself. The access track blends perfectly into the landscape, staying aligned with the character of the surrounding countryside. Upon completion, the surface is now flat, firm and puddle free.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][ult_buttons btn_title=”BACK TO CASE STUDIES” btn_link=”url:%2Fcase-study%2F||” btn_title_color=”#ffffff” btn_bg_color=”#000000″ btn_bg_color_hover=”#f08021″ btn_title_color_hover=”#ffffff” icon_size=”32″ btn_icon_pos=”ubtn-sep-icon-at-left”][/vc_column][/vc_row][vc_row][vc_column][/vc_column][/vc_row][vc_row][vc_column][/vc_column][/vc_row]